New Building Update (April)

2.jpg

If you've been past the corner of 20th Ave and Queensway lately you might have noticed that the outside of our building is done!! We are so excited about how great everything has come together. Once the front courtyard is cleaned up we plan to share another blog post of all of our before and after pictures. The changes are unreal. The above picture is of the corner of the building closest to 20th ave, facing Queensway. This will be our front door.

This past week a couple of our electricians have been hard at work getting all of the wiring done inside the building. You can see in the photo below that the cable trays have all been installed. This is the upstairs open work space that our Application Engineers and Graphic Designers will be working. We plan to keep the ceiling exposed so that we can show off all of the duct work and super clean wiring. This building will feature everything Inland is all about!! Once all of the electrical work is complete, we can start tackling the dry wall.