College of New Caledonia

CNC has campuses in Prince George, Quesnel, Vanderhoof, Burns Lake, Fort St. James and Mackenzie and provides college education to roughly 12% of British Columbia. We have provided HVAC services to all 6 campuses as well as lighting, access, and irrigation controls at the Prince George campus. We maintain familiar control sequences from a previous controls contractor but are continually making improvements where necessary and approved. All controls listed below at each campus are fully integrated and accessible from one user interface.

HVAC – Acquired complete control of HVAC systems

  • Boilers
  • Chillers
  • Heat Pumps
  • Variable Air Volume Boxes
  • Air Valves
  • Air Handling Units
  • Multizones
  • Heating Control Valves
  • Cooling Control Valves
  • Critical Gas Detection
  • Exhaust Fans
  • ABB Variable Speed Control for pumps and fans
  • Complete recommission
  • Slab Heating
  • Tenant adjustable thermostats
  • Provide graphics and BACnet DDC user interfaces to air balancer for proper commissioning of air handlers and VAVs
  • Integration with third-party BACnet devices, such as boilers, pumps, gas detectors, etc.
  • New Delta hardware

 

Lighting – PG Brinks, PG TEC, and PG Heavy Duty

  • Self-calculating astronomical control for exterior lights
  • Schedule for custodian hours
  • Schedule for class and office hours
  • Master switch station for physical control of large sets of lights
  • Occupancy detectors for energy savings
  • Complete recommission
  • New Panasonic wall switches
  • Photocell sensor for dimming control in Brinks’ student lounge
  • New Delta hardware

 

Access – PG Brinks, PG Heavy Duty

  • Customizable door access
  • Up to 50,000 card users
  • Door lock schedules
  • New Delta hardware

 

Irrigation – Entire Prince George Campus

  • Rain sensor to prevent unnecessary use of water to moisten zones
  • Zones cycle at operator adjustable intervals
  • Operator adjustable schedules
  • Operator adjustable runtimes
  • Fall blowout to keep valves clean during off-season
  • New Delta hardware